** Please note, due to the nature of our business, we sometimes work with Clients under non disclosure agreements, this means we not always able to list the name of the specific project or location of work.


2017 Dublin Runway Rehabilitation
Project Management and Programming

Project management and programming for this complex night time resurfacing project undertaken in Dublin. BDPSP provided handover support to enable the new permanent Project Manager to take up their position.


2017 RAF Marham
Quality Management

BDPSP implemented a quality management process for the joint venture completing the project to undertake this complex design and build. BDPSP provided QA support for the materials to be used for this project. Read our case study here


2017 Airport Ponds
Project Management and Programming

BDPSP worked for Lagan to complete remediation of two attenuation ponds at the airport, providing project management, on site supervision and programming the works.


2017 Ground Running Enclosure
Planning Requirements

BDPSP worked with an airport to close out specific planning requirements to enable a project to proceed.


2018 Various
Technical Writing

BDPSP worked with Lagan to complete technical writing and programming of a large airfield project.


2018 Various
Bid Management

BDPSP worked with GMRH to undertake a series of tender bid submission for work in and around Scotland.


2018 Ground Running Enclosure
Works Supervision and Quality Assurance

BDPSP worked with an airport to construct a ground running enclosure for aircraft testing. This saw BDPSP providing on site supervision for the airport Client, and quality assurance, in confirming the works had been constructed as specified.


2018 Airfield Pavement Inspection
Maintenance Inspection

BDPSP completed a pavement condition summary report to Tier 3 standards for an airport. Read our case study here


2018 Airport ponds inspection
Maintenance Inspection

BDPSP completed a maintenance report and summary budget for two airside attenuation ponds. Read our case study here


2018 Airport roof inspection
Maintenance Inspection

BDPSP completed a drone survey of a Hangar roof to confirm its condition for an airport. Read our case study here


2018 London Southend Airport
Pre-Construction

BDPSP worked with LSA to develop the pre-construcion works information, programme, methodology, design and CAA requirements (Part 1 and 2) to enable the resurfacing of the runway to proceed.


2019 London Southend Airport
Works Supervision and Quality Assurance

BDPSP worked with an LSA to resurface their runway. This saw BDPSP providing on site supervision for the airport Client, and quality assurance, in confirming the works had been constructed as specified. Read our case study here


2019 London Southend Airport
Maintenance Inspection

BDPSP completed a pavement condition summary report to Tier 3 standards for an airport. Read our case study here


2019 Airfield Pavement Inspection
Maintenance Inspection

BDPSP completed a pavement condition summary report to Tier 3 standards for an airport. Read our case study here


2019 Ground Running Enclosure
Health and Safety Management and Supervision

Following completion of the GRE, BDPSP provided HS support to enable safe transition to operation of the new structure, including development of the procedures required for commissioning.


2019 European Airport
Pre-Construction

BDPSP provided a risk register and management strategy to a European Contractor to enable them to proceed with a project.


2019 Airport NavAids
CDM Site Visit

BDPSP completed a site visit enabling key items to be identified for the pre-construction health and safety information to be generated.


2019 M23 Smart Motorway Project
Project Management and Administration

BDPSP undertook the project management, programming and general administration works for the M23 Smart Motorway Project on behalf of Aggregate Industries. Read our case study here


2020 London Southend Airport
Maintenance Inspection

London Southend Tier 3 pavement inspection to confirm pavement condition and associated report for scheduling and budget management. Read our case study here


2020 Airport NavAids
Works Supervision and HS Management

BDPSP have undertaken works supervision and safety management for an airport client, for the installation of navigational aids. The project incorporated airside working to excavate for pit and ducts, concrete pours, lifting and fixing of structural components, electrical and comms connections and commissioning of the equipment. BDPSP managed airport interfaces, supervision of works in progress and safety management of the site.


2020 Airport Maintenance
Maintenance Inspection

Removal of a flue from a Hangar roof required internal and external inspection. BDPSP worked with LHP and BlueSky to provide a drone survey and internal photography without requiring confined space or working at height access. Read our case study here


2020 Airport Maintenance
Health and Safety Management

BDPSP assisted BDI in their annual maintenance requirements providing assistance in working safely.


2020 Highway Resurfacing
Bid Management and Programming

BDPSP worked with Pro-Tar, enabling tender submission to be completed. BDPSP took on the management of the bid submission and programming for the works, including site visits and photography.


2020 New House Construction
Planning Requirements

BDPSP worked with NDDL to respond to specific planning conditions required to be closed out and enable works to proceed.


2020 Airfield Pavement Inspection
Maintenance Inspection

BDPSP completed a pavement condition summary report to Tier 3 standards for an airport. Read our case study here


2021 Airport ILS Replacement
Works Supervision and HS Management

BDPSP have undertaken works supervision and safety management for an airport client, for the installation of an instrument landing system. The project incorporated airside working to excavate for pit and ducts, concrete pours, lifting and fixing of structural components, electrical and comms connections and commissioning of the equipment. BDPSP managed airport interfaces, supervision of works in progress and safety management of the site.


2021 Isle Of Man Airport Ground Services Refurbishment – Package 2
Project Management

BDPSP have undertaken the role of Project Manager for the Isle Of Man Ronaldsway Airport Ground Services Refurbishment. The project encompassed resurfacing works to the northern and southern ends of the runway, taxiways and aprons, adjustments to drainage, and an upgrade of the AGL system.


2021 Airfield Pavement Inspection
Maintenance Inspection

BDPSP completed a pavement condition summary report to Tier 3 standards for an airport. Read our case study here


2021 Airfield Taxiway Rehabilitation
NEC Works Supervisor and Provision of Airside Security Escort

BDPSP worked with a UK airport to supervise the rehabilitation of two taxiways. The works were undertaken over a few nights to ensure the airport could remain operational and included saw cut and sealing to the existing concrete taxiway, and the application of Rhinophalt to the existing asphalt taxiway.


2021 Campbeltown Runway 11/29 & AGL Rehabilitation
Project Management Services

BDPSP were pleased to work with Lagan Aviation and Infrastructure to complete Campbeltown Airport Runway Rehabilitation in only 38 days, providing Project Management services for the work. The works included planing of the existing runway, laying binder and surface courses of Marshall asphalt, cleaning and repairs to drainage, and upgrading/relocating the APAPI system.